Producing a smart locker involves comprehensive processes that need to be adhered to in order to think of a functional locker that fulfills the demands of the customer. The manufacturing process is a really complicated one than anyone cares to admit. Making a simple mistake may result in big losses and this might also result in the failure of the job in question. The procedure has to be adhered to in order to succeed.
- There is a need to determine the Project and understand all of the requirements that the clients may have
- Create an analysis of the product
- Make a proposal of the potential Solution which may be applied
- After the proposal, the customer needs to produce a confirmation of the plan strategy as laid out. After receiving this strategy, the client can opt to verify if it is going to serve as a last solution in line with the requirements he may have.
- The following procedure is done by the Engineering department where the wise locker is designed and subsequently developed. It’s also in this step that machine part machine and drawing assembly drawing is done after the laid out criteria. The executive parts and the electronic parts are also chosen. A list is made from the components that are utilized for processing and the conventional parts requisition for purchase is drafted. Here, the instructions will also be laid out.
- Parts processing and the Procurement of the normal parts also must be done.
A Parts processing is the Responsibility of the processing click and collect lockers. This is done in accordance with the appearance of the diagrams. This processing must be strictly in accordance with dimensional accuracy and the processing technologies as marked on the diagrams that the precision needs to be guaranteed and the processing technologies adhered to.
B Procurement staff then needs to Contact suppliers in order to get the normal parts in accordance with the list.
- Machine assembly is another step and that is usually carried out by the assembly section. The machine is constructed and then corrected. The operators collect all of the parts from the list. The machine is then constructed strictly after what’s laid out in the drawings, making certain all components are correct. The engineering department must arrange all of the electrical aspects. Programming and debugging can be done.